NCC 2025 readiness

NCC 2025 is operative in some states today, NCC 2022 still applies in others.

Since 1 May 2026 every state and territory has taken its own path. Victoria is on NCC 2025. Western Australia defaults to NCC 2025 but still lets applicants elect NCC 2022, and the ACT lets you choose either edition, both until 30 April 2027. New South Wales, Queensland and Tasmania (which adopted, then reverted five weeks later) stay on NCC 2022 until 1 May 2027. South Australia split the code: plumbing on NCC 2025, building on NCC 2022. The Northern Territory has set NCC 2025 aside until the next edition is published.

A practitioner shouldn’t have to track all of that. DatumDesk leads with the edition operative for your jurisdiction today, and surfaces what changes for you later.

By jurisdiction

Which edition applies where, and what changes next.

Checked against state legislation and regulator instruments, not aggregator tables. Last reviewed 22 September 2026.

  • Victoria

    NCC 2025
    • NCC 2025 has been the only edition since 1 May 2026, with no general election window.
    • A project stays on NCC 2022 only if the relevant building surveyor certifies substantial design progress before 1 May 2026 (Building Act 1993, s10(2)).
    • Lead-free plumbing products are required for all regulated plumbing work from 1 May 2026, even where permits or contracts pre-date it.
    • Regulator: the Building and Plumbing Commission (formerly the VBA).
  • Western Australia

    NCC 2025 · NCC 2022 electable
    • NCC 2025 has been the default since 1 May 2026. A permit applicant can elect NCC 2022 instead, but only for applications made before 1 May 2027 (Building Regulations 2012, reg 31A(2)).
    • WA modifications (reg 15C): livable housing is voluntary, and the separate NatHERS heating and cooling load limits do not apply (the combined limit still does).
    • Bushfire concession (reg 15D): until 30 April 2028, NCC 2019 Part G5 is accepted for early childhood centres and schools, and adjoining Class 10a buildings and decks, in bushfire prone areas.
  • Australian Capital Territory

    NCC 2022 or NCC 2025
    • Until 30 April 2027 you can build to either NCC 2022 or NCC 2025, each with its ACT Appendix (Disallowable Instrument DI2026-56). Nominate one edition at lodgement; provisions cannot be mixed.
    • From 1 May 2027 NCC 2025 is mandatory, except for work whose Development Application or Works Approval Application was lodged before 1 November 2026. That work keeps the choice of edition.
    • Lodged means the Completeness Check is finalised and all fees are paid. Submitting before 1 November is not enough on its own.
    • 1 November 2026 is a lodgement cutoff only. Nothing becomes mandatory on that date.
  • New South Wales

    NCC 2022
    • NCC 2022 Amendment 2 applies until 30 April 2027. NCC 2025 applies from 1 May 2027, with no election window before then.
    • NSW variations to NCC 2025 are already announced. Work on an existing part of a building may keep using the NCC 2022 waterproofing Parts F1 and F3.
    • Class 2 buildings whose consent requires a BASIX certificate issued under BASIX version 4.0 or later stay on the NCC 2022 Section J energy requirements.
  • Queensland

    NCC 2022
    • NCC 2022 Amendment 2 applies until 30 April 2027. NCC 2025 applies from 1 May 2027, with no election window.
    • The Queensland Development Code applies alongside the NCC. Revised MP 4.1 Sustainable Buildings and MP 4.5 Livable Dwellings have been in force since 14 August 2026.
    • The Queensland Housing Code commenced on 1 September 2026, but only applies in a council area once that council adopts it in its planning scheme.
  • South Australia

    Building NCC 2022 · Plumbing NCC 2025
    • Building (Volumes One and Two): NCC 2022 Amendment 2 with the SA variations in MBS 007 until 30 April 2027, then NCC 2025 from 1 May 2027.
    • Plumbing (Volume Three): NCC 2025 has applied since 1 May 2026.
    • Some MBS 007 concessions run past May 2027, including alterations and additions assessed under NCC 2019 for applications lodged before 1 May 2030.
  • Tasmania

    NCC 2022
    • NCC 2022 Amendment 2 applies until 30 April 2027, then the latest NCC edition from 1 May 2027.
    • NCC 2025 was briefly in force from 1 May to 4 June 2026, until the Building Amendment Act 2026 reverted it.
    • If your approval was issued between 1 May and 4 June 2026, check which edition applies with CBOS. The legal position for that group is not settled.
  • Northern Territory

    NCC 2022
    • NCC 2022 with the existing NT variations applies. NCC 2025 has no effect in the NT (Gazette S31, 29 April 2026).
    • That holds until the next edition of the NCC is published. An amendment to NCC 2025 does not change it, and no NT adoption date has been announced.
Key dates
  1. 1 November 2026ACT: last day to have a Development Application or Works Approval Application lodged and keep the choice of edition after April 2027.
  2. 1 May 2027NCC 2025 applies in NSW, Queensland, Tasmania and South Australia (building). It becomes mandatory in the ACT, subject to the lodgement exception. WA applicants can no longer elect NCC 2022.
  3. 30 April 2028WA bushfire concession ends. The national lead-free plumbing transition also ends (Victoria required lead-free from 1 May 2026).
How DatumDesk handles the split

Both editions covered. The right one cited for your state.

Practitioners in different states are bound by different editions of the same code today. DatumDesk lets you pick your jurisdiction once and gets every answer right after that.

  • Both editions, cover to cover

    NCC 2022 (Volumes One, Two, Three, Housing Provisions) and NCC 2025 (the same set). Every answer cites the exact clause and page it came from, so you can verify it in the source document.

  • Jurisdiction-aware by default

    Pick your state once. DatumDesk leads with the edition operative there today, and surfaces what differs in the other edition as forward-planning information, never as binding compliance.

  • State variations tracked separately

    NCC volumes plus each state’s appendix and instruments: Victorian Building and Plumbing Commission material, NSW variations and BASIX, Queensland Development Code parts, SA Ministerial Building Standard MBS 007, WA regulation 15C modifications, the ACT election instrument, Tasmanian transition rules and NT Gazette notices. Each is kept distinct from the national text and flagged when it varies.

  • Auto-flips when your state changes status

    On 1 May 2027 NSW, Queensland, Tasmania and SA building move to NCC 2025, and the ACT and WA election windows close, with the ACT lodgement exception carried through. Tasmania already reversed its adoption once. The jurisdiction map is a single version-controlled source of truth, re-verified against state legislation. When a state changes status, every answer, edition chip and audit record updates with it.